Slab formwork is one of the most important stages in construction, where formwork serves as temporary support to harden concrete until it reaches a good strength value. Among the highly adopted systems in contemporary construction is Mivan formwork. Being known for efficiency and accuracy, the best tools are not always put to efficiency when applied incorrectly. Here are the top five mistakes to avoid with slab formwork: ensuring safety and project success.
- Inadequate Planning and Design
The most common mistake in using slab formwork is poor planning and design. A poorly designed formwork system can result in uneven slabs, structural weaknesses, or even catastrophic failures. Before starting the project, one needs to ensure that the design accounts for load-bearing capacity, proper alignment, and adequate support.
Mivan formwork systems are pre-engineered but may still require adjustments to fit specific project requirements. Work closely with experienced engineers to avoid any design-related issues. Read more- https://expertsay.blog/top-5-mistakes-to-avoid-with-slab-formwork/